LIANZHONG INDUSTRY CO.,LIMITED.
|
Price: | 500.0~1000.0 USD |
Payment Terms: | T/T,WU |
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Adopt imported P20, Germany 2316, S136 etc, steel.
2. Hot runner is designed advanced and reasonably, each cavity heat controlled independently, temperature uniform.
3. Each cavity a d core have independent cooling system, shorten production cycle time.
4.Cavity can be changed, convenient to change remark of the cap.
Mould Data
Specification | NO. of Cavity | 16 Cavity | 24 Cavity | 32 Cavity |
¢28mm | W*L*H(cm) | 48*47*45 | 64*47*49 | 80*49*53 |
Weight(kg) | 720 | 1000 | 1450 | |
¢30mm | W*L*H(cm) | 48*48*57 | 66*52*54 | 85*53*58 |
Weight(kg) | 920 | 1300 | 1850 | |
¢38mm | W*L*H(cm) | 54*58*54 | 74*58*59 | 95*63*63 |
Weight(kg) | 1180 | 1750 | 2600 |
Our Services
LZ MOULD Trade Process
1.Quote | According to sample, drawing and specific requirement. |
↓ | |
2.Discussion | Mold material, cavity number, price, runner, payment, etc. |
↓ | |
3.S/C Signature | Approval for all the items |
↓ | |
4. Advance | Pay 30% by T/T |
↓ | |
5.Product Design Checking | We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report. |
↓ | |
5.Mould Design | We make mould design on the basis of confirmed product design, and send to customer for confirmation. |
↓ | |
6.Mold Tooling | We start to make mold after mold design confirmed |
↓ | |
7.Mold Processing | Send processing photos to customer |
↓ | |
8.Mold Testing | Send trial samples and try-out report to customer for confirmation |
↓ | |
9. Mold Modification | According to customer's feedback |
↓ | |
10.Balance settlement | 70% by T/T after the customer approved the trial sample and mould quality. |
↓ | |
11.Delivery | Delivery by sea or air. The forwarder can be designated by your side. |
After-Sale Service
a) Engineer and one interpreter can be sent to customer's factory for first running.
b) one-year after-sale technique support
Mould Maintenance
a) When the mould is vacant, spray the anti-rust oil
b) To clean the gate and cooling system regularly
Mould Quality Control
For the Q/C of mould, there are 3 steps:
1.Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- Each part of mould's size checking after machining according to 2D drawing
- mould testing(check mould running condition)
3.check with customer's requirement again before mould shipping.